HARC carried out the risk assessment study of three reservoirs in Tuggeranong Creek, Canberra. The study included the update of the hydrology of the Tuggeranong Creek catchment; dambreak simulation using TUFLOW model, Estimation of Potential Loss of Life using HEC-LifeSim; and economic consequence assessment of the three reservoirs.