Tuggeranong Creek Consequence and Risk Assessment

HARC carried out the risk assessment study of three reservoirs in Tuggeranong Creek, Canberra. The study included the update of the hydrology of the Tuggeranong Creek catchment; dambreak simulation using TUFLOW model, Estimation of Potential Loss of Life using HEC-LifeSim; and economic consequence assessment of the three reservoirs.